Información Básica.
No. de Modelo.
JC-03
voltaje
96
Poder
10kw
Asiento Nº
4
Tipo
BEV
Proceso de dar un título
PUNTO, CEE
Tipo de cuerpo
Abierto
Marca Comercial
jinchen
Origen
Hunan
Código del HS
8504409992
Capacidad de Producción
5000pieces/año
Descripción de Producto
| Basic parameters | ||||
| Rated number of passengers | 4 persons | Braking System | Front and rear disc brakes | |
| Dimensions (L×W×H) | 2950×1500×1550 mm | Suspension system | Hydraulic,F:disk /R: drum | |
| Wheelbase | 2100mm | |||
| Wheelbase (F/R) | 1250/1320mm | Braking distance | < 5m (40km /h ) | |
| Drive type | front wheel driving | Parking brake | Hand brake for rear wheel | |
| Maximum grade | >=20% | Speed control | Pedal control/automatic | |
| Minimum turning diameter | 9 m | Electrical System | DC 12V 500W | |
| Transmission | Fixed speed ratio, electronic speed control and reversal | Ground clearance | 150 mm (full load) | |
| Tire type (F/R) | 155/65R13 | Seat belt | √ | |
| Aluminum wheel hub | √ | Spare wheel | √ | |
| Power system | ||||
| Model | Lead Acid Battery(72 V 5KW) | Lead Acid Battery(96 V10 KW) (EEC L7e) | LiFePo4 (96 V10KW) (EEC L7e) | |
| Motor | 72V 5KW | 96V 10KW PMSM | 96V 10KW PMSM | |
| Controller | 72V 5KW | 96V 10KW | 96V 10KW | |
| Battery Type | lead acid | lead acid | Ternary lithium battery | |
| Battery Life | Recharging 800 times | Recharging 800 times | Recharging 1000 times | |
| Curb weight | 573kg | |||
| Full load quality | 873kg | |||
| Maximum speed | 50km/h | 70km/h | 70km/h | |
| Driving range | 150 km (45 km/h , 25 ºC) | 160-180 km (45 km/h , 25 ºC) | 160-180 km (45 km/h , 25 ºC) | |
| Options (price changes) | ||||
| Body material | Standard configuration | All aluminum | / | |
| Optional | Made of iron | Price change | ||
| Steering wheel position | Standard configuration | left rudder | / | |
| Optional | right rudder | Need to add price | ||
| Awning type | Standard configuration | No awning | / | |
| Optional | Half awning | Need to add price | ||
| full awning | Need to add price | |||
| Options (stable) | ||||
| Bumper type | Straight line type | Annular type | ||
| Dashboard display | Metric | imperial | ||
| Rechargingr | AC /220V | AC / 110V | other | |
| Color options (customizable) | ||||
| Front grille color | White | the color of car (6 basic colors are available, other colors require additional price) | red | |
| black | yellow | |||
| Dark green | White | |||
| seat color | White | blue | ||
| black | Dark green | |||
| valid for 1 month | black | |||
| Date : March 2024 | ||||



















Company Profile
Settled in Huaihua in 2017, full construction has been completed
and mass production has been achieved. The main manufacturing
directions are export products, special vehicles, tool trucks and
logistics vehicles. The annual output of various types of vehicles is 8,000 units, with sales of approximately 300 million yuan.
On April 1, 2023, it won the "World Manufacturer Identification
Code" certificate
Settled in Huaihua in 2017, full construction has been completed
and mass production has been achieved. The main manufacturing
directions are export products, special vehicles, tool trucks and
logistics vehicles. The annual output of various types of vehicles is 8,000 units, with sales of approximately 300 million yuan.
On April 1, 2023, it won the "World Manufacturer Identification
Code" certificate.
Registered in July 2022, the Shandong Lijin New Energy Special Vehicle Industrial Park project is the third largest base in the country built by the group focusing on the new energy heavy-duty engineering vehicle segment.The existing factory has entered trial production and is expected to produce 5,000 mining trucks, tractors, etc., and more than 30,000 logistics vehicles annually. It also signed a sales agreement with the central enterprise Electric Power Construction Group, with annual sales of no less than 5,000 units.Lijin County has vigorously introduced new energy projects such as Huachi Flywheel Energy Storage. The introduction of these projects can connect the back-end products of new chemical materials and the front-end raw materials of new energy processing and manufacturing into a chain, achieving integrated development of the industrial chain.
Starting from November 2021, Secretary Qiu of the Liaoyuan High-tech Zone Management Committee led a team to Jincheng to inspect and sign a contract to settle in the Liaoyuan Economic Development Zone; in December of the same year, the Liaoyuan Municipal Government, Changchun University of Science and Technology, and Jincheng Group signed a strategic cooperation; 2022 In January of this year, Jincheng Heavy Industry Co., Ltd. completed its registration, started construction and equipment installation simultaneously, and all equipment has been installed. On the auspicious morning of October 13, 2023, the unveiling ceremony of Liaoyuan Jincheng Heavy Industry Co., Ltd. was held grandly.
Note: The price does not include a full-coverage canopy.